Gas (LPG)
Area of use
- Loading/unloading of tank trucks, rail tankers, bob tails and heavy vehicle filling.
- Main products: Dry Gas Couplings 1“ to 8“.
- Bottom loading of LPG tank truck using 3” DGC for liquid phase and 2” DGC for vapour recovery.
- DGC are both of integrated breakaway design.
- Bottom loading of LPG rail tanker using 3” DGC for liquid phase and 2” DGC for vapour recovery.
- Loading arm also equipped with breakaways.
Contact
If you have any questions don’t hesitate to contact our LPG Business Developer Manager, Cenkiz Tesson
Telephone: +31 652 091 143
E-mail: cenkiz.tesson@manntek.se